| SPINDLE TOOLING, TOOLING HOLDER AND OPTIONAL EQUIPMENT FOR CYCLEMATIC HIGH SPEED. HIGH ACCURACY TOOLROOM LATHES |
- Special features
- Specification
- Operation manual
| CYCLEMATIC have applied the Digital Threading technology from 618e toolroom lathe to CHR-68 chucker. The chucker is part of our toolroom lathe lineup. It comes with a 8-station indexing tool turret for quickly changing tools on complicated job setups. It also has 8-position carriage stop that can be setup to simplify multiple repetitive tool feeds. Previously for threading operations chucker lathe relied on a separate threading attachment that was bulky and cumbersome. Now with CHR-68e's Digital Threading capability, threading operations are microprocessor controlled and carried out by synchronized spindle speed and servo motor feed. All the operator needs to do is punch in desired thread pitch and thread direction then start the spindle rotation and carriage feed as normal using start/stop levers at the headstock. No gears to change. Less moving parts, easier maintenance. |
|||||
|
|||||
| Digital Threading makes threading on chucker lathe easier than ever
Digital Threading provides touchscreen LCD to select thread pitch. Choose target TPI or mm pitch on the screen , set spindle rpm and start threading just like on conventional lathes. Simple No threading attachment. No threading gearbox. Less moving parts, quiet operation, maintenance free design. Servo driven design Internally, servo motor drives the leadscrew so feed rate is synchronized in proportion to spindle rpm. |
|||||
![]() |

![]() |
![]() |
![]() |
![]() |
![]() |
| Expanding Collet | Vacuum Chuck | Hydraulic Chuck | Chuck Back Plate | 6" 3-jaw Chuck |
![]() |
![]() |
![]() |
![]() |
![]() |
| Lathe Dog | Face Plate | Pneumatic Chuck | Precision Diaphragm Chucks |
Step Chuck |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
| Straight and Taper Turning Slide for Double Tool Cross Slide |
Quick Change Adjustable Tool Holder |
Quick Acting Recessing Tool |
Knee Tool | Slide Tool | Boring Tool Holder |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
| Centering and Facing Tool |
Releasing Tap Holder | Tool Holder Extension | Adjustable Rotary Stops |
Adjustable Tool Holder |
Releasing Tap Holder |
|
| MODEL | CHR-68e | |
| Spindle Capacity | With Chuck | 150 mm(6") |
| With Expanding Collets | 76 mm (3" ) | |
| With Round 5C Collets | 27 mm (1-1/16") | |
| With Hexagon 5C Collets | 22 mm (7/8") | |
| With Square 5C Collets | 19 mm (3/4" ) | |
| With Step Chucks | 27 ~ 152mm(1-1/16-6") | |
| Spindle Nose Diameter | Ø55.5 mm (2.189") | |
| Spindle Nose I.D/O.D | 5C (10°) / 4° Tapern 5C (10°) / Ø55.5 mm-10TPI |
|
| Spindle Speeds (Variable) | 50-4000 R.P.M. | |
| Inverter Spindle Motor | 3 HP | |
| Hole Through Spindle | 31.75mm (1-1/4") | |
| Bar stock diameter (5C collet) | Ø27 mm (Ø1-1/16") | |
| Swing Over Bed | 330 mm (12.992") | |
| Carriage Power Feed Range (Variable) | 9~160 mm/min (0.354" ~ 6.299") | |
| Cross Slide Power Feed Range (Variable) | 6~250 mm (0.236" ~ 9.842") | |
| Cross Slide Travel | 114mm (4.488") | |
| Coolant Pump | 1/8HP, 220V, 3PH | |
| Feed Inberter Motor | 1/2 HP | |
| Range of Threads | 0.2~6.35 mm (120~4TPI) | |
| Main motor | 3 HP, 220V, 3PH (Standard) | |
| Net/Gross weight | 2,200/2,420 lb. (1,000 / 1,100 kg.) | |
| Machine packing dimension | 1,910 × 860 × 1,860 mm (74" × 34" × 73") | |
| All dimensions, specifications and machine appearance are subject to change without prior notice. | ||
![]() |
|
We are so glad you choosing CHR-68e chucking machine. It will satisfy your expectations of many features such as rigidity, high accuracy, easy operation…etc. We expect all operators can read this manual carefully before starting this machine. It describes operation, inspection, maintenance, lubrication, leveling and setup of this machine. Our CHR-68e is built by quality materials and finest engineering skill. So operators with proper care and use are sure without any trouble. For supporting machines life, all operators need use this manual at any time. |
|
|
|
![]() CHR-68e |
|
![]() Figure 1 - Lifting machine |
|
|
Lifting machine, arrange rope or cable as shown in figure 1, and check to see if the correct balance has been obtained. Then insert pads of soft cloth between the edges of the rope and machine. The net weight of this machine is approx 1100 kgs (2420 lbs). So the rope or cable must be rated at 3000 lbs capacity. |
|
An inspection should be made after arrival of the machine in your plant. Look for possible damage caused by shock or vibration during transportation, also check for any missing parts, standard tools or other equipment. In shipment, all exposed surfaces of the machine are coated with a antirust liquid. Before moving carriage and cross-slide, lead screw tailstock…etc, these surfaces should be thoroughly cleaned to remove all antirust liquid use a soft brush and solvent. This is very important because it can prevent any dirt or grit which may have accumulated on the antirust liquid from working under the sliding members and causing undue wear. ※CAUTION: |
A fairly flat foundation and proper installation will provide the machine long-term high accuracy, so supplying a good solid foundation of proper thickness is important. (Generally, a thickness of 300mm (12") is considered to be enough.) The machine has six adjustable feet on the corners of the pedestal base, used for leveling the machine. Place the pads under the feet of pedestal. To adjust, loosen the set screw and raise or lower the foot with a pin wrench so that all six feet rest firmly on the floor. When the adjustment is done, tighten set screws |
The CHR-68e TOOLROOM LATHE is shipped completely wired and assembled, Turn Cam Switch "A"(Figure 2) to the "OFF" position, then check motor voltage. Loosen screws "B"(Figure 2), and open the switch case cover, connect the wires from the power source to the terminals (R.S.T), and ground connection is made at the "G"(Figure 3) which is the electric switch case. Pull out Spindle locking Pin "E" (Figure 4), push "G" (Figure 4) in forward position. The spindle should rotate counterclockwise when viewed from the tailstock end of the machine. If the spindle dose not turn in the correct direction, turn Cam Switch "A" (Figure 2) to "OFF" position. Disconnect electric power source, and interchanges any two leads until the turning direction is correct. When the spindle is rotation correctly, secure switch case cover, turn Cam Switch "A" (Figure 2) to "ON" position. |
||||||||||
|
||||||||||
| ※ CAUTION : RUNNING THE MACHINE IN THE WRONG DIRECTION WILL RESULT IN DAMAGE TO THE SPINDLE SPEED CHANGE UNIT. |
||||||||||
Proper lubrication supplied carefully , will maintain the life and performance of the machine for a long period. Therefore, lubricate the machine with a high quality lubricant, and check periodically to assure that the lubricant in the oil sight gage is filled to the proper level. 1. CARRIAGE LUBRICATION Fill with Mobil Vactra Oil No.2 (machine oil #20) or equivalent in oil reservoir. Lift plunger on reservoir "R" (Figure 5) hold briefly and release to keep bed ways lubricated. ![]() Figure 5-Speed Change Unit Maintain oil level in sight windows "W" (Figure 7). To fill gearbox, remove plug "C" (Figure 7) use Automatic Transmission Fluid Mobil 200 (Esso ATF or equivalent Change oil every 500 hours). To drain oil, remove the Drain Plug "M" located under the oil gear box (Figure 7).
USE OF ANY OTHER TYPE OF OIL IN THE GEARBOX MAY RESULT IN DAMAGE TO THE CLUTCH SURFACES. 3. HEADSTOCK LUBRICATION The headstock spindle is mounted on precision preloaded ball bearings. The ball bearings are grease packed for life and require no further lubrication. |
|||
| To change spindle speeds. Push start button "D" (Figure 8). Turn cam switch "C" (Figure 10) to the forward or reverse position and move lever "G" (Figure 9) to the start position. Turn cam switch "D" (Figure 10) to right to increase speed or to left to decrease speed. | ||||
![]() Figure 10-Control Speed Control Box |
||||
While you threading, you have to following the steps to set up, first choose the mm/inch "H" or "G" (Figure 11) by touch screen, and choose the Right hand thread “E” (Figure 11) or Left hand thread "F" (Figure 11) by touch screen, after that choose the pitch "G" (Figure 11) and engage the lead screw nut by moving ball handled lever "I" (Figure 13) clockwise. Start the spindle by moving the lever" G" (Figure 12). Move the lever "D" (Figure 12) to make movement going left or right. The threading speed is all control by server motor , so if your make the spindle speed faster, the threading speed also will going faster, The rapid speed is control by rapid retract cam "B" (Figure 11).
※ CAUTION : PLEASE FOLLOW TOP OF THREAD CHART , THE SPINDLE SPEED DO NOT OVER SPEED . IF SPINDLE SPEED OVER THE LIMIT , THE TOUCH SCREEN WILL APPEAR “SPINDLE OVER” . ALSO THE THERADING FUNCTION WILL NOT WORK . |
|||||||||||||||||||||
For CHR-68e have DRO system, the position all appear in touch screen "L" and "M" (Figure 14) or touch position button "O" (Figure 14) to only show the X and Z position, by big character coordinates (Figure 17). If want to set the position number or set position to zero, must be touch set button "A" (Figure 17). If didn’t touch set button can not be set position to zero or any number. |
Touch the memory bottom "N" (Figure 14) will appear the digital operation system. Touch "A" (Figure 15) set button before doing any memorize step. If didn’t touch set button and memorize key can not be work. Touch the "B" (Figure 15) to memorize Z and X position from and "D"& "C" (Figure 15). For digital operation have 8 set of memory to memorize the X and Z position. Touch the |
![]() Figure 14-Control Speed Control Box |
|
|
When threading into a blind hole or to a shoulder without a thread relief. The lead screw half nut if engaged at the start of the threading work is completed. Left or right hand threads are controlled by Control lever "D" (Figure 18), the lever is joined with the control bar "B" (Figure 19). When the carriage touches the adjusting screw "S" (Figure 19) of the length control bar, it will push the lever "D" (Figure 18) to "STOP" position, and make the lead screw stop. |
|||
|
|||
Inverter unit "D" is used to perform dynamic braking. In addition, discharge resister “C” shortens braking time (Figure 20). |
![]() Figure 20-Control Unit |
Run spindle at approximately 1000 rpm. Move lever "G" (Figure 21) to center "STOP" position and let the spindle coast to a stop. This is done to equalize belt tension. Loosen lock nut "N" (Figure 22) with 19mm wrench. Turn adjusting screw "P" (Figure22) with screwdriver clockwise to tighten belts. Stop machine and check belt tension, there should be approx.1" of play in belt.
|
|||
| Running the machine with the collet closer and not having a collet locked in place will damage the collet closer. Remove the collet closer when using chucks, face plates, or spindle nose type fixtures. The collect closer should be removed often for cleaning to prevent loading of chips between collet closer tube and inside of spindle at rear and collet threads. Removal method is:Pull out pin "L" (Figure 23). Slide draw tube out of the spindle. Do not turn the adjusting nut "N" (Figure 23). It is keyed to the spindle. To remove slide it off the end of the spindle. Do not remove collet closer by removing screw "S" (Figure 23), this screw has been adjusted at the factory for proper operation of the collet closer. | ![]() Figure 23-Collet Closer Removal |
| Before replacement of the closer, clean inside of the headstock spindle and outside diameter at rear of spindle where Adjusting Nut "N" (Figure 24) is located. Apply a film of light oil on rear of spindle Do not force Adjusting Nut "N" on spindle. If Adjusting Nut "N" fits to tight, remove and check for burrs or scratches, then replace. Clean collet closer tube inside and out apply a film of light oil on slip surface "T" (Figure 24) of the collet closer tube, replace collet loser and insert Link Pin "L" (Figure 24). | ![]() Figure 24-Collet Closer Removal |
|
|||||||||
| Single dials with Inch Hand wheel dial "W" (Figure 27) graduations are in 0.005". It is built for the operator's convenience of operation, both of hand wheel have indicate position system L (Figure 27). The X axis have 8 position indicate system I (Figure 27). | ![]() Figure 27-Carriage Indicating |
| To hold the carriage in a fixed position on the bed use the Carriage Lock Handle "H" (Figure 28). Move the lock handle "H" (Figure 28) clockwise toward the operator, lock the carriage in position. Move the lock handle "H" (Figure 28) counterclockwise away from the operator. To unlock the carriage. | ![]() Figure 28-Carriage Look |
![]() Figure 29-Carriage Clutches |
The CHR-68e have quick-change turret. Pull handle H (Figure 30) down, the turret locker G (Figure 30) will unlock then the turret will turn to next position. CHR-68e turret have 6 position, each position repeat accuracy is 0.005mm.
![]() Figure 30-Cross Slide Indicated Ring and Quick Acting |
| The carriage Power Feed unit is mounted on the carriage. It is powered by a AC motor "M" (Figure 31).
WHEN STARTING INTO PRODUCTION. AN OPERATOR CAN SET THE FEED CONTROL “N” TO THE RECORDED REFERENCE SETTING, THEN THE SAME TESTED RESULTS WILL BE OBTAINED. |
|||
| When use power feed unit control to do the facing parts , we can use CHR-68e facing length control unit to control the length . To loose screw C (Figure 34) to move the facing length . Also screw B (Figure 34) can be adjust the length . | ![]() Figure 33-Facing Stoper |
| The coolant pump is controlled by Switch "C" (Figure 34). Turn Switch "C" (Figure 34) to "ON" position, the pump will run continuously, turn to "AUTO" position, the pump will run only when the machine is running. If pump switch is set at "OFF" position, the coolant pump is off. Pump should be cleaned periodically, depending on the type of material being machined. | ![]() Figure 34-Control Unit Door |











































"E" (Figure 15) switch to 1~4 memory set or 5~8 memory set (Figure 16). Touch return "F" (Figure 15) to return to the main screen.




















